1. Erection and dismantling of metal scaffolds of height 5.0 m
Hazard: Fall from height
Control Measures:
1. Use full-body harness with secured anchorage points
2. Ensure proper scaffold erection with guardrails and toe boards
2. Bored Piling Works
Hazard: Cave-in or collapse of excavation site
Control Measures:
1. Install proper shoring or trench supports
2. Conduct soil testing before excavation
3. Cutting of wooden planks using circular saw
Hazard:
Contact with moving blade leading to cuts/amputation
Control Measures:
1. Use push sticks and guards on the saw
2. Wear appropriate PPE (gloves, safety goggles)
4. One worker carrying pipes weighing 25 kG
Hazard:
Musculoskeletal injury due to heavy lifting
Control Measures:
1. Use mechanical lifting aids (e.g., trolleys)
2. Train workers on proper manual handling techniques
5. Hacking Works
Hazard:
Flying debris causing eye injuries
Control Measures:
1. Wear safety goggles and face shields
2. Use dust suppression measures
6. Demolition of building of height 30 m
Hazard:
Falling debris striking workers below
Control Measures:
1. Install overhead protection (catch platforms or safety nets)
2. Restrict unauthorized personnel from the demolition zone
7. Hoisting and lowering of rebar cages
Hazard:
Falling load due to sling failure
Control Measures:
1. Use certified lifting slings and inspect before use
2. Keep workers out of the drop zone
8. Cleaning of pipes using solvent
Hazard:
Inhalation of toxic fumes
Control Measures:
1. Provide adequate ventilation or use extraction fans
2. Ensure workers wear respiratory protection
9. Excavation trench of depth 4 m
Hazard:
Trench collapse leading to worker burial
Control Measures:
1. Use trench boxes or shoring
2. Conduct daily inspections before work starts
10. Worker mixing of cement
Hazard:
Skin irritation or burns from cement contact
Control Measures:
1. Wear gloves and long sleeves
2. Provide washing stations for immediate cleanup
11. Roof top waterproofing and ceiling works
Hazard:
Slipping or falling from height
Control Measures:
1. Use non-slip footwear and harnesses
2. Ensure proper edge protection and warning signage
12. Installation of perimeter hoardings in worksite
Hazard:
Struck by falling hoarding materials
Control Measures:
1. Secure hoarding panels properly before releasing
2. Use mechanical lifting aids where possible
13. OXY-Acetylene Gas Cutting of Rebars
Hazard:
Fire or explosion from gas leaks
Control Measures:
1. Perform leak tests before use
2. Store cylinders in a well-ventilated area away from ignition sources
14. Electric Arc Welding of pile casing
Hazard:
Eye damage from welding arc flash
Control Measures:
1. Wear welding helmet with proper shade lens
2. Use welding curtains to shield others from flash
15. Entry into Confined Space
Hazard:
Oxygen deficiency or toxic gas exposure
Control Measures:
1. Conduct gas testing before entry
2. Ensure workers use proper PPE and have an emergency retrieval plan
Short answer for table paper writing -
-
Erection and dismantling of scaffolds (5m) – Fall from height
- Use full-body harness
- Install guardrails and toe boards
-
Bored Piling Works Cave-in
- Use shoring or trench supports
- Conduct soil testing
-
Cutting wooden planks (circular saw) – Cuts/amputation
- Use push sticks and blade guards
- Wear gloves and safety goggles
-
Carrying pipes (25kg) – Musculoskeletal injury
- Use mechanical lifting aids
- Train on proper lifting techniques
-
Hacking Works – Flying debris
- Wear safety goggles
- Use dust suppression
-
Demolition (30m height) – Falling debris
- Install overhead protection
- Restrict access
-
Hoisting/lowering rebar cages – Falling load
- Use certified lifting slings
- Keep workers out of the drop zone
-
Cleaning pipes (solvent) – Inhalation of fumes
- Ensure ventilation
- Use respiratory protection
-
Excavation (4m trench) – Trench collapse
- Use trench boxes
- Conduct daily inspections
-
Mixing cement – Skin irritation
- Wear gloves and long sleeves
- Provide washing stations
- Roof waterproofing/ceiling work – Fall hazard
- Use harness and non-slip footwear
- Install edge protection
- Installing perimeter hoardings – Struck by falling materials
- Secure panels properly
- Use mechanical lifting aids
- OXY-Acetylene Cutting – Fire/explosion
- Perform leak tests
- Store gas cylinders properly
- Electric Arc Welding – Eye damage (arc flash)
- Wear welding helmet
- Use welding curtains
- Confined Space Entry – Oxygen deficiency
- Conduct gas testing
- Use PPE and emergency retrieval system