BCSS Hazard & Control Measure Question and answer



 1. Erection and dismantling of metal scaffolds of height 5.0 m

Hazard: Fall from height

Control Measures:

1. Use full-body harness with secured anchorage points

2. Ensure proper scaffold erection with guardrails and toe boards



2. Bored Piling Works

Hazard: Cave-in or collapse of excavation site

Control Measures:

1. Install proper shoring or trench supports

2. Conduct soil testing before excavation



3. Cutting of wooden planks using circular saw

Hazard

Contact with moving blade leading to cuts/amputation

Control Measures:

1. Use push sticks and guards on the saw

2. Wear appropriate PPE (gloves, safety goggles)



4. One worker carrying pipes weighing 25 kG

Hazard

Musculoskeletal injury due to heavy lifting

Control Measures:

1. Use mechanical lifting aids (e.g., trolleys)

2. Train workers on proper manual handling techniques



5. Hacking Works

Hazard

Flying debris causing eye injuries

Control Measures:

1. Wear safety goggles and face shields

2. Use dust suppression measures



6. Demolition of building of height 30 m

Hazard

Falling debris striking workers below

Control Measures:

1. Install overhead protection (catch platforms or safety nets)

2. Restrict unauthorized personnel from the demolition zone



7. Hoisting and lowering of rebar cages

Hazard:

 Falling load due to sling failure

Control Measures:

1. Use certified lifting slings and inspect before use

2. Keep workers out of the drop zone



8. Cleaning of pipes using solvent

Hazard:

 Inhalation of toxic fumes

Control Measures:

1. Provide adequate ventilation or use extraction fans

2. Ensure workers wear respiratory protection



9. Excavation trench of depth 4 m

Hazard

Trench collapse leading to worker burial

Control Measures:

1. Use trench boxes or shoring

2. Conduct daily inspections before work starts



10. Worker mixing of cement

Hazard

Skin irritation or burns from cement contact

Control Measures:

1. Wear gloves and long sleeves

2. Provide washing stations for immediate cleanup



11. Roof top waterproofing and ceiling works

Hazard

Slipping or falling from height

Control Measures:

1. Use non-slip footwear and harnesses

2. Ensure proper edge protection and warning signage



12. Installation of perimeter hoardings in worksite

Hazard

Struck by falling hoarding materials

Control Measures:

1. Secure hoarding panels properly before releasing

2. Use mechanical lifting aids where possible



13. OXY-Acetylene Gas Cutting of Rebars

Hazard

Fire or explosion from gas leaks

Control Measures:

1. Perform leak tests before use

2. Store cylinders in a well-ventilated area away from ignition sources



14. Electric Arc Welding of pile casing

Hazard

Eye damage from welding arc flash

Control Measures:

1. Wear welding helmet with proper shade lens

2. Use welding curtains to shield others from flash



15. Entry into Confined Space

Hazard:

 Oxygen deficiency or toxic gas exposure

Control Measures:

1. Conduct gas testing before entry

2. Ensure workers use proper PPE and have an emergency retrieval plan



Short answer for table paper writing -

  1. Erection and dismantling of scaffolds (5m) – Fall from height

    • Use full-body harness
    • Install guardrails and toe boards
  2. Bored Piling Works  Cave-in

    • Use shoring or trench supports
    • Conduct soil testing
  3. Cutting wooden planks (circular saw) – Cuts/amputation

    • Use push sticks and blade guards
    • Wear gloves and safety goggles
  4. Carrying pipes (25kg) – Musculoskeletal injury

    • Use mechanical lifting aids
    • Train on proper lifting techniques
  5. Hacking Works – Flying debris

    • Wear safety goggles
    • Use dust suppression
  6. Demolition (30m height) – Falling debris

    • Install overhead protection
    • Restrict access
  7. Hoisting/lowering rebar cages – Falling load

    • Use certified lifting slings
    • Keep workers out of the drop zone
  8. Cleaning pipes (solvent) – Inhalation of fumes

    • Ensure ventilation
    • Use respiratory protection
  9. Excavation (4m trench) – Trench collapse

    • Use trench boxes
    • Conduct daily inspections
  10. Mixing cement – Skin irritation

  • Wear gloves and long sleeves
  • Provide washing stations
  1. Roof waterproofing/ceiling work – Fall hazard
  • Use harness and non-slip footwear
  • Install edge protection
  1. Installing perimeter hoardings – Struck by falling materials
  • Secure panels properly
  • Use mechanical lifting aids
  1. OXY-Acetylene Cutting – Fire/explosion
  • Perform leak tests
  • Store gas cylinders properly
  1. Electric Arc Welding – Eye damage (arc flash)
  • Wear welding helmet
  • Use welding curtains
  1. Confined Space Entry – Oxygen deficiency
  • Conduct gas testing
  • Use PPE and emergency retrieval system