This template follows the Workplace Safety and Health (WSH) Guidelines on Safe Lifting Operations in Singapore. It ensures compliance with local regulations, including the WSH Act, SS 536:2008 (Code of Practice for Safe Use of Mobile Cranes), and MOM Lifting Requirements.


LIFTING PLAN

(As per Singapore Standard and WSH Guidelines)

1. General Information

  • Project Name: [Insert Project Name]
  • Location of Lift: [Site Address]
  • Date & Time: [DD/MM/YYYY] | [Time]
  • Lift Type: ☐ Ordinary Lift ☐ Critical Lift
  • Prepared By: [Name & Designation]
  • Reviewed By: [Name & Designation]
  • Approved By: [Competent Person]

2. Load Details

  • Description of Load: [E.g., Steel Beams, Machinery, Pipes]
  • Weight of Load: [XX] kg / tonnes
  • Dimensions (L × W × H): [XX] m × [XX] m × [XX] m
  • Center of Gravity: [Position]
  • Any Special Considerations: [E.g., Fragile, Off-center weight]

3. Lifting Equipment & Accessories

  • Type of Crane Used: ☐ Mobile Crane ☐ Tower Crane ☐ Crawler Crane ☐ Other: ________
  • Crane Make & Model: [E.g., Tadano ATF 220G-5]
  • Crane Capacity: [XX] tonnes
  • Boom Length & Radius: [XX] m / [XX] m
  • Lifting Accessories:
    • Sling Type: [Wire Rope / Chain / Synthetic]
    • Sling Length & SWL: [XX] m / [XX] tonnes
    • Shackles & SWL: [XX] tonnes
    • Hooks, Spreader Bars, Other: [Specify]
  • Equipment Inspection Date: [DD/MM/YYYY] (Ensure valid Lifting Gear Certification)

4. Lifting Methodology

  • Step-by-Step Procedure:
    1. Site Preparation – Set up exclusion zone, inspect ground conditions
    2. Crane Setup – Position crane, check boom angle, secure outriggers
    3. Load Securing – Attach slings/shackles, balance load
    4. Lifting Process – Signal confirmation, slow and controlled lift
    5. Load Placement – Lower load safely, confirm stability before release
    6. Post-Lift Checks – Inspect equipment, return to safe position

5. Personnel Involved

6. Risk Assessment & Control Measures

7. Site Preparation & Environmental Considerations

  • Weather Check: ☐ Clear ☐ Rain ☐ Windy ☐ Other: _______
  • Ground Stability Check: ☐ Stable ☐ Requires reinforcement
  • Exclusion Zone Set: ☐ Yes ☐ No
  • Barricades & Signage: ☐ Installed ☐ Not Required
  • Permit to Work (PTW) Required: ☐ Yes ☐ No

8. Communication Plan

  • Method: ☐ Hand Signals ☐ Radio ☐ Verbal Commands
  • Responsible Person for Coordination: [Name]

9. Approval & Signatures


This Lifting Plan complies with Singapore’s WSH Act, SS 559:2010 (Code of Practice for Safe Lifting), and MOM Guidelines on Safe Lifting Operations.