Lifting Plan Template (Singapore Standard - WSH Guidelines) sample

 


Lifting Plan Template (Singapore Standard - WSH Guidelines)

This template follows the Workplace Safety and Health (WSH) Guidelines on Safe Lifting Operations in Singapore. It ensures compliance with local regulations, including the WSH Act, SS 536:2008 (Code of Practice for Safe Use of Mobile Cranes), and MOM Lifting Requirements.


LIFTING PLAN

(As per Singapore Standard and WSH Guidelines)

1. General Information

  • Project Name: [Insert Project Name]
  • Location of Lift: [Site Address]
  • Date & Time: [DD/MM/YYYY] | [Time]
  • Lift Type: ☐ Ordinary Lift ☐ Critical Lift
  • Prepared By: [Name & Designation]
  • Reviewed By: [Name & Designation]
  • Approved By: [Competent Person]

2. Load Details

  • Description of Load: [E.g., Steel Beams, Machinery, Pipes]
  • Weight of Load: [XX] kg / tonnes
  • Dimensions (L × W × H): [XX] m × [XX] m × [XX] m
  • Center of Gravity: [Position]
  • Any Special Considerations: [E.g., Fragile, Off-center weight]

3. Lifting Equipment & Accessories

  • Type of Crane Used: ☐ Mobile Crane ☐ Tower Crane ☐ Crawler Crane ☐ Other: ________
  • Crane Make & Model: [E.g., Tadano ATF 220G-5]
  • Crane Capacity: [XX] tonnes
  • Boom Length & Radius: [XX] m / [XX] m
  • Lifting Accessories:
    • Sling Type: [Wire Rope / Chain / Synthetic]
    • Sling Length & SWL: [XX] m / [XX] tonnes
    • Shackles & SWL: [XX] tonnes
    • Hooks, Spreader Bars, Other: [Specify]
  • Equipment Inspection Date: [DD/MM/YYYY] (Ensure valid Lifting Gear Certification)

4. Lifting Methodology

  • Step-by-Step Procedure:
    1. Site Preparation – Set up exclusion zone, inspect ground conditions
    2. Crane Setup – Position crane, check boom angle, secure outriggers
    3. Load Securing – Attach slings/shackles, balance load
    4. Lifting Process – Signal confirmation, slow and controlled lift
    5. Load Placement – Lower load safely, confirm stability before release
    6. Post-Lift Checks – Inspect equipment, return to safe position

5. Personnel Involved

6. Risk Assessment & Control Measures

7. Site Preparation & Environmental Considerations

  • Weather Check: ☐ Clear ☐ Rain ☐ Windy ☐ Other: _______
  • Ground Stability Check: ☐ Stable ☐ Requires reinforcement
  • Exclusion Zone Set: ☐ Yes ☐ No
  • Barricades & Signage: ☐ Installed ☐ Not Required
  • Permit to Work (PTW) Required: ☐ Yes ☐ No

8. Communication Plan

  • Method: ☐ Hand Signals ☐ Radio ☐ Verbal Commands
  • Responsible Person for Coordination: [Name]

9. Approval & Signatures


This Lifting Plan complies with Singapore’s WSH Act, SS 559:2010 (Code of Practice for Safe Lifting), and MOM Guidelines on Safe Lifting Operations.

Would you like a Word or Excel version of this template?

একটি মন্তব্য পোস্ট করুন

0 মন্তব্যসমূহ

সিঙ্গাপুরে ওয়ার্ক পারমিটধারীদের জন্য নতুন নিয়ম: চাকরির মেয়াদ সীমা বাতিল, সর্বোচ্চ বয়সসীমা ৬৩ বছর
বাংলাদেশের মুক্তিযুদ্ধের সঠিক ইতিহাস
সিঙ্গাপুরে ট্রেইনিং রেকর্ড এবং সার্টিফিকেট চেক করার বিস্তারিত গাইড
Bangla date add in your website HTML tips.
some common interview questions and answers for a Safety Coordinator position in Singapore
ধর্ষণবিরোধী বিক্ষোভে উত্তাল তিন বিশ্ববিদ্যালয়, শিক্ষার্থীদের আল্টিমেটাম
Understanding the New Demerit Point System for Construction and Manufacturing Sectors
Safe work procedure for ferrying workers by lorry in singapore
বাংলাদেশি শ্রমিকদের জন্য সিঙ্গাপুরে কম খরচে দাঁতের চিকিৎসা
সিঙ্গাপুর কর্মস্থলের নিরাপত্তা আইন শক্তিশালী করছে এবং নতুন আইন প্রবর্তন করছে
Loading posts...